Maps

Geographical and technical details on the SEA Gas and Mortlake pipeline systems.

Nameplate Rating

Pipeline NamePipeline Short NameNameplate Rating (TJ)
Port Campbell to AdelaidePCA314
Port Campbell to IonaPCI400

Receipt and Delivery Points

PipelineMeter NameTypeConnects to
PCAMinerva PCAReceipt PointMinerva Gas Plant
PCALangley PCAReceipt/Delivery PointPCI Pipeline
PCAOtway PCAReceiptOtway Gas Plant
PCAUGSReceipt/Delivery PointIona Gas Plant
PCAPoolaijeloDelivery PointSESA Pipeline
PCANaracoorteDelivery PointTeys Australia
PCAJervoisDelivery PointBeston Pure Dairies
PCABolivarDelivery PointSA Water
PCACavanDelivery PointAdelaide STTM
PCATorrens IslandDelivery PointTorrens Island Power Station
PCAQuarantineDelivery PointQuarantine Power Station
PCAPelican PointDelivery PointPelican Point Power Station and MAPS
PCIMinerva PCIReceipt/Delivery PointMinerva Gas Plant
PCILangley PCIReceipt/Delivery PointPCA Pipeline
PCIOtway PCIReceiptOtway Gas Plant
PCIMortlakeReceipt/Delivery PointMortlake Pipeline
PCIM-UGSReceipt/Delivery PointIona Gas Plant
PCISWPReceipt/Delivery PointSouth West Pipeline
PCIOtway UFM 4Receipt/Delivery PointSouth West Pipeline
PCIMPSWCPDelivery PointSouth West Pipeline

Technical Characteristics

PipelinePCA
Design Life, Pipeline:80 years
Design Life, Cathodic Protection System:40 years
Commissioning Date:January 2004
Maximum Allowable Operating Pressure:15,306 kPag
Installed Length:689 km
PipelinePCI
Design Life, Pipeline:80 years
Design Life, Cathodic Protection System:40 years
Commissioning Date:January 2004
Maximum Allowable Operating Pressure:15,306 kPag
Installed Length:12 km