Pipeline Name | Pipeline Short Name | Nameplate Rating (TJ) |
---|---|---|
Port Campbell to Adelaide | PCA | 254 |
Port Campbell to Iona | PCI | 400 |
Mortlake | MORT | 150 |
Effective 01/01/2023
Pipeline Name | Pipeline Short Name | Nameplate Rating (TJ) |
---|---|---|
Port Campbell to Adelaide | PCA | 254 |
Port Campbell to Iona | PCI | 400 |
Mortlake | MORT | 150 |
Effective 01/01/2023
Pipeline | Meter Name | Type | Connects to |
---|---|---|---|
PCA | Athena (PCA) | Receipt Point | Athena Gas Plant (formerly Minerva Gas Plant) |
PCA | Langley (PCA) | Receipt/Delivery Point | PCI Pipeline |
PCA | Otway (PCA) | Receipt | Otway Gas Plant |
PCA | UGS | Receipt/Delivery Point | Iona Gas Plant |
PCA | Poolaijelo | Delivery Point | SESA Pipeline |
PCA | Naracoorte | Delivery Point | Teys Australia |
PCA | Jervois | Delivery Point | Beston Pure Dairies |
PCA | Bolivar | Delivery Point | SA Water |
PCA | Cavan | Delivery Point | Adelaide STTM |
PCA | Torrens Island | Delivery Point | Torrens Island Power Station |
PCA | Quarantine | Delivery Point | Quarantine Power Station |
PCA | Pelican Point | Delivery Point | Pelican Point Power Station and MAPS |
PCI | Athena (PCI) | Receipt/Delivery Point | Athena Gas Plant (formerly Minerva Gas Plant) |
PCI | Langley (PCI) | Receipt/Delivery Point | PCA Pipeline |
PCI | Otway (PCI) | Receipt | Otway Gas Plant |
PCI | Mortlake | Receipt/Delivery Point | Mortlake Pipeline |
PCI | M-UGS | Receipt/Delivery Point | Iona Gas Plant |
PCI | SWP | Receipt/Delivery Point | South West Pipeline |
PCI | Otway UFM 4 | Receipt/Delivery Point | South West Pipeline |
PCI | MPSWCP | Delivery Point | South West Pipeline |
MORT | MIJ-001 | Receipt/Delivery Point | PCI Pipeline |
MORT | Mortlake PRMS | Delivery Point | Mortlake Power Station |
Pipeline | PCA |
---|---|
Design Life, Pipeline: | 80 years |
Design Life, Cathodic Protection System: | 40 years |
Commissioning Date: | January 2004 |
Maximum Allowable Operating Pressure: | 15,306 kPag |
Installed Length: | 689 km |
Pipeline | PCI |
---|---|
Design Life, Pipeline: | 80 years |
Design Life, Cathodic Protection System: | 40 years |
Commissioning Date: | January 2004 |
Maximum Allowable Operating Pressure: | 15,306 kPag |
Installed Length: | 12 km |
Pipeline | Mortlake |
---|---|
Design Life, Pipeline: | 25 years |
Design Life, Cathodic Protection System: | 20 years |
Commissioning Date: | February 2011 |
Maximum Allowable Operating Pressure: | 15,306 kPag |
Installed Length: | 82 km |